Kaiser Permanente
Napa Data Center Renovation
Location:
2600 Napa Valley Corporate Dr
Napa, California 94558
Contract Amount:
$891,053.00 (billed to-date)
Square Footage:
80,000 (Phase I)
80,000
(Phase II and III)
Project Start and End Date:
09/06/06 – Ongoing
This project scope included the renovation of the existing Napa data center
and the acquisition of an additional 160,000 S.F. The
project entailed enclosing most of first floor glazed area, seismic upgrades,
approximately 61,000 S.F. of raised floor area, approximately 30,000 S.F. of
support space (offices, cubicles, etc.) and complete MEP upgrades to support
4 MW total load with V/D data equipment included. In subsequent phases, the
MEP infrastructure is being upgraded to support incremental MW increases to
5 MW, 7.5 MW, and 10 MW.
Genelco has served as the commissioning authority for all phases of this renovation
and remains the commissioning authority for work on-going with responsibility
for full commissioning of existing and new equipment, controls and monitoring
systems.
A partial list of systems commissioned to-date includes:
- (8) 4,000A distribution switchboards
- Generator paralleling system and fuel oil transfer pumps
- (2) 1,500kW diesel engine generators
- (2) Input, bypass, and tie interlocked switchboards
- (8) 675kW/750kVA UPS modules and associated battery systems with monitoring
- (30) 225kVA PDU’s
- (60) RPP panels
- EPO system
- (4) Centrifugal 1000 ton chillers
- Central plant pumping system
- (1000+) circuit breakers (low voltage primary current injection testing)
- Hot water system
- Chilled water piping loop system with automatic valves
- (60) Chilled water CRAC units
- Air handling units and exhaust fans
- Leak detection system